Learning Center

Installation

  • Installation Basic

    Click Here to download our installation guide.

  • How do I calculate waste?

    A.   we suggest to order 10 % additional material “called waste” as a standard.

    In addition; there are other factors that requires you to increase the material needed.

    • If you have outside cuts or self return. Each such corner requires 2 times the projection of the profile. Example; A cove that has 6″ projection, you will need to add 12″ for each of such corner.
    • if the cove has a pattern. The longer the repeat of a pattern in a profile, more waste might be required.